Scheuten Solar implements 800 kWp project with Amstel Lease
Scheuten Solar has implemented a turnkey EPC (Engineering, Procurement & Construction) project on the roof of the modern float glass factory f | glass in Osterweddingen, Germany (a joint venture between Scheuten and Interpane). The installation of nearly 4000 solar panels was financed by Amstel Lease by means of a lease set-up. The solar panels have an output of almost 800 kWp. The project is the second collaboration between Scheuten Solar and Amstel Lease, who previously implemented a 100 kWp project in the Netherlands together.
Download press release (English)
Download press release (German)
Download press release (Dutch)